Scenario: A city’s administration isn’t driven by the goal of maximizing revenues or profits but instead looks at improving the quality of life of its

Scenario:

A city’s administration isn’t driven by the goal of maximizing revenues or profits but instead looks at improving the quality of life of its residents. Many American cities are confronted with high traffic and congestion. Finding parking spaces, whether in the street or a parking lot, can be time consuming and contribute to congestion. Some cities have rolled out data-driven parking space management to reduce congestion and make traffic more fluid. 

You’re a data analyst working for a mid-size city that has anticipated significant increments in population and car traffic. The city is evaluating whether it makes sense to invest in infrastructure to count and report the number of parking spaces available at the different parking lots downtown. This data would be collected and processed in real-time, feeding an app that motorists can access to find parking space availability in different parking lots throughout the city. 

Part 1: Data Manipulation

Download the Parking Lot Use data set (attached). The data set has the following columns:

  • LotCode: a unique code that identifies the parking lot
  • LotCapacity: a number with the respective parking lot capacity
  • LotOccupancy: a number with the current number of cars in the parking lot
  • TimeStamp: a day/time combination indicating the moment when occupancy was measured
  • Day: the day of the week corresponding to the TimeStamp

Insert a new column, OccupancyRate, recording occupancy rate as a percentage with 1 decimal. For instance, if the current LotOccupancy is 61 and LotCapacity is 577, then the OccupancyRate would be reported as 10.6 (or 10.6%).

Using the OccupancyRate and Day columns, construct box plots for each day of the week. You can use Insert > Insert Statistic Chart >Box and Whisker for this purpose. Is the median occupancy rate approximately the same throughout the week? If not, which days have lower median occupancy rates? Which days have higher median occupancy rates? Is this what you expected?

Using the OccupancyRate and LotCode columns, construct box plots for each parking lot. You can use Insert > Insert Statistic Chart >Box and Whisker for this purpose. Do all parking lots experience approximately equal occupancy rates? Are some parking lots more frequented than others? Is this what you expected?

Select any 2 parking lots. For each of them, prepare a scatter plot showing occupancy rate against TimeStamp for the week 11/20/2016 – 11/26/2016. Are occupancy rates time dependent? If so, which times seem to experience the highest occupancy rates? Is this what you expected?

Part 2: Presentation

Prepare a 12- 14 slide presentation with detailed speaker notes and audio, graphs, and tables.

Your audience is the city council, which is responsible for deciding whether the city invests resources to set in motion the smart parking space app.

Complete the following in your presentation:

  • Outline the rationale and goals of the project
  • Utilize box plots showing the occupancy rates for each day of the week. Include your interpretation of results.
  • Utilize box plots showing the occupancy rates for each parking lot. Include your interpretation of results
  • Provide scatter plots showing occupancy rate against the time of day of your selected 2 parking lots. Include your interpretation of results
  • Make a recommendation about continuing with the implementation of this project.

Include speaker notes that convey the details you would give if you were presenting. You will record your speaker notes.

Ensure that the slides contain only essential information and as little text as possible.

Share This Post

Email
WhatsApp
Facebook
Twitter
LinkedIn
Pinterest
Reddit

Order a Similar Paper and get 15% Discount on your First Order

Related Questions

21:26 VPN BUSA 6170 Course Project Overall Guidelines.docx Phoenix Files X Students will utilize course learning objectives in creating a compediensive MS

21:26 VPN BUSA 6170 Course Project Overall Guidelines.docx Phoenix Files X Students will utilize course learning objectives in creating a compediensive MS Word document explaining concepts, derailing calculations, and discussing recommended decisions based on their analysis of the provided data set. Ne dint quotes are accept able. Mi submitted documents

Competencies In this project, you will demonstrate your mastery of the following competencies: Interpret psychological data using quantitative and

Competencies In this project, you will demonstrate your mastery of the following competencies: Interpret psychological data using quantitative and qualitative methods Apply the principles of statistical methods to inform a research problem Scenario You work for a market research company that supplies information to non-profit organizations throughout the nation. Your

Reflection Consider the following: How is data analytics different from statistics? What are the main differences between descriptive, predictive, and

Reflection Consider the following: How is data analytics different from statistics? What are the main differences between descriptive, predictive, and prescriptive analytics tools? How do businesses use analytics to convert raw operational data into actionable information? Reflect on the following in a minimum of 500 words. Think about the organization

Assignment Content ADDED sample assignment with correct formatting. 7/22/2024 Research tips and strategies for effective written and oral

Assignment Content ADDED sample assignment with correct formatting. 7/22/2024 Research tips and strategies for effective written and oral communication. Begin by searching the University Library, but feel free to search elsewhere as well. Your search may include articles, journals or publications, websites, or other online media.  I will practice these under the

Case Problem 4. Workforce Scheduling Davis Instruments has two manufacturing plants located in Atlanta, Georgia. Product demand varies considerably from

Case Problem 4. Workforce Scheduling Davis Instruments has two manufacturing plants located in Atlanta, Georgia. Product demand varies considerably from month to month, causing Davis extreme difficulty in workforce scheduling. Recently Davis started hiring temporary workers supplied by WorkForce Unlimited, a company that specializes in providing temporary employees for firms